We like to use the welding machine, Migatronic provides us with proper gear for that.

Similar Posts

Six weeks to go, engine assembled
The engine is assembled, now it just had to be dropped down in the engine bay and get a gearbox behind itself. This is great progress and with only six weeks to go we had a short team-meeting this weekend. Everything is looking like it’s going to be a hell of a season, we got…

Long nights in the garage
Hello not a lot of post this week, we have been really busy in the garage. The last problems with the drifter was found on Thursday and the lack of boost was also fixed. The main problems with the boost was the turbo which was changed and a crack in the intake manifold which was welded. When those faults…

Street legal turbodiesel – Part 2 – Fixing the body
The build continues with fixing the body. As we needed to fix some rust and dents we decided to paint the whole car.

The to do list is getting shorter.
We were a bunch of people at the garage yesterday and by the end of the evening we got to replace theese to-do-lists to one short one. We have fitted some new safety equipment and a new shut of system that actually works for this season. Ville tought it would look nice with tinted windows. Teemu and Ville…