[vc_row][vc_column][vc_column_text]In this episode we only fire it up after almost two years of not even touching it. As usual, everything goes as planned.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_video link=”https://www.youtube.com/embed/zBqBm617otY”][/vc_column][/vc_row]
Similar Posts
Diesellandia – Herlevi.fi
Diesellandia, also known as Herlevi pulling team takes care of our diesel pumps.
Garage Day – Building the new mercedes
The team had a great day stripping down the new car, the car is all clean now and ready for washing and some sand.”pics or it didn’t happen”? ye there’s a few more in the post. 🙂 Â
Engine fitted, dashboard done!
Engine is mounted fitted and piping has started. Enjoy some pictures! We replaced the oil pump and changed the gear for it to get rid of the cavitation. The wheel did not fit properly in the oil pan so we remade it a little, check out the pics (; Oil coolers are fitted and tubing…
Victory at EPUA Drifting – Seinäjoki
A little unplanned, a little low on expectations and very laid-back the whole team woke up at 5:30, saturday and headed for Seinäjoki and EPUA-Drift (about 200km from where we’re situated). The Finnish Pro Drifting Association arranged event turned out great with more than 3000 in the crowd and some very impressive 26 drivers. The…